Various Minor and Major Works for Private Developers below are just a few of the many jobs Nova has undertaken:
The Bluewater Group
- Variety of small sewer and water mains.
Tobco/Australian High Voltage
- Light Rail & Watermain adjustments/connections
MMA/AXIS Plumbing
- Wynyard Walk – Sydney Water Stormwater, 450 and 375 grpp with 4.8m manholes
Diona Pty LTd
- Concrete Encasement of various sewer and water mains.
- New Line Road and Sebastian Drive Dural
- Watermain Renewals
Ledonne Constructions
- Ploughman’s Valley Stormwater Harvesting Rising Main - Construction of DICL Water Main
BMD Construction - ACT
- Kingston Foreshore - Water, Sewer & Drainage Package
- Barton Highway – Gounyan Curves Realignment - Stormwater Package
- Lanyon Drive - Stormwater & Subsoil Package
- Cohen St Extension, Belconnen - Installation of 225mm & 150mm DICL watermain.
- Franklin Estate Stages 3A, 3B, ACT - Installation and testing of entire water main including 3 bores under Flemington Road and installation of all house services.
Brindabella Civil Engineering - ACT
- Canberra Airport - Installation of 600m of 225mm watermain and 110 PE irrigation pipe. Works include connections and testing.
- Kingston Foreshore - Installation of 150mm DICL to new bridge at Kingston Foreshore.
Cappello Plumbing - ACT
- West Belconnen Children’s & Family Centre - Installation of 100m of 300FRC stormwater and 100m of 150mm sewer.
Queanbeyan City Council - ACT
- Replace Water Main - Crawford St, Queanbeyan Contract 06/2009
- Replacement of 150mm DICL watermain and upgrade of all services plus connections into
- existing watermain.
Akron - ACT
- Bonner Estate - Repair works to existing services and preparation of all watermain tie-ins for Actew.
JRK - NSW
- Bourke St – Raising sewermain adjustment, DN355 PE, Managament and FIFM of Sewerage pumping stations shutdown and bypass.